SJSM dijangka beroperasi semula akhir tahun ini-TNB

SJSM dijangka beroperasi semula akhir tahun ini-TNB TAKIYUDDIN (paling kanan) dan Ahmad Samsuri (tengah) diiringi Baharin melihat secara dekat antara kawasan terjejas akibat tanah runtuh ketika meninjau kerja-kerja membaik pulih Stesen Janakuasa Sultan Mahmud (SJSM), baru-baru ini. Oleh NURFARAHIN HUSSIN 11 April 2022, 10:39 am PETALING JAYA: Proses baik pulih Stesen Janakuasa Sultan Mahmud (SJSM)...

MARC ASSIGNS “GOLD” RATING TO TNB POWER GENERATION SDN BHD’S SUSTAINABILITY SUKUK FRAMEWORK

Posted Date: April 5, 2022 MARC has assigned a “Gold” Sustainability Sukuk Assessment to TNB Power Generation Sdn Bhd’s (TPGSB or the Issuer) Sustainability Sukuk Framework. TPGSB, a wholly-owned subsidiary of Malaysia’s largest electricity utility Tenaga Nasional Berhad (TNB), is proposing to issue a Sustainability Sukuk to exclusively finance and/or refinance loans obtained to finance...

HeadquartersTNB Power Generation Sdn. Bhd.
Aras 2, Bangunan TNB Genco
No. 129, Jalan Bangsar
59200 Kuala Lumpur
Get In TouchTNB Genco Social links
Total Visit: 351862

Copyright by TNB Genco. All rights reserved.

Best view in 1920 x 1080 resolution

Copyright by TNB Genco. All rights reserved.